Confident Vendor‑Neutral AGV Project Planning.

From strategy to vendor selection.
Hands-on guidance from experienced AGV experts.

Start Your AGV Project Right

Animation: Instead of fixed conveyors or forklifts with drivers, an AGV drives open routes from A to B. An order reaches the AGV from a light barrier at a conveyor, or from the ERP via the fleet manager and WiFi. It picks up the pallet, and an underride AGV lifts a load off a transfer station. The AGV triangulates reflectors, slows and stops for a person, reports completion and charges while it waits. AGV systems range from a simple loop to fleet traffic management.

Expert Knowledge

From basics to advanced topics: navigation, costs, specifications, VDA 5050 and more. Practical and vendor-neutral.

Consulting

Specification writing, vendor selection, project support. From experienced AGV experts who speak your language.

Layout Editor

Draw routes, place stations, and run a simple simulation.
Free and no installation required.

AGV projects take 6–12 months.
Most mistakes happen in the first 4 weeks.

Layout Editor

Draw routes, place stations, and run a simple simulation.
Free and no installation required.

Free Initial Consultation